Data Cabling and Stainless Steel Pipework
Case Study

Project: Clopton Bridge
Sector: Telecoms
Region: Midlands
Duration: 6 weeks
The Brief.

Working from floating pontoons, UE Group replaced the old pipework with more durable stainless steel pipe and data cabling below Clopton Bridge spanning the River Avon, replacing the old ironwork with more durable stainless steel pipework this 6-week project was completed without interruption to data, phone services or the road network.

We are happy to supply references from many of the UK’s best-known businesses.
Clopton Bridge Engineering Project